Operation of G.T. Pisangan Connected Becakayu Toll Road Section 1A and Ir. Wiyoto Wiyono
Jakarta - #SobatBPJT Pisangan Toll Gate (GT) which is connected to the Bekasi-Cawang-Kampung Melayu (Becakayu) Toll Road and the Ir Wiyoto Wiyono MSc Toll which is located on the west side starting today from 06.00 WIB.
The operation of GT Pisangan is based on the Decree of the Minister of Public Works and Public Housing (PUPR) Number 276 / KPTS / M / 2021 concerning the Stipulation of the Operation of the Bekasi-Cawang-Kampung Melayu Toll Road Section 1A Connection to the Ir. Wiyoto Wiyono West Side and Section 1B On Ramp Jatiwaringin since March 9, 2021.
The Pisangan GT consists of 2 (two) Single and Multi GTO Gates, which can be passed by Class I, II, III, IV, V and VI vehicles. The operation of GT Pisangan was carried out by PT Citra Marga Nusaphala Persada Tbk (CMNP) as the manager of the Toll Road Ir Wiyoto Wiyono MSc.
It is hoped that after the operation of the Bekasi Cawang Kampung Melayu Toll Road Section 1A which is connected to the Ir. Wiyoto Wiyono MSc will establish a new toll road interconnectivity network system and facilitate travel distance for the community, especially those from Bekasi and its surroundings.
Then, after the operation of this toll gate, it is also hoped that it can increase the flow of vehicles in and out of the two toll roads.
The 33 Km Ir Wiyoto Wiyono Msc Toll Road is divided into the Cawang-Tanjung Priok (North South Link / NSL) section of 19.03 KM and the Tanjung Priok-Jembatan Tiga / Pluit (Harbor Road / HBR) section of 13.93 KM.
This toll road is the inner city toll road section Cawang-Tanjung Priok-Ancol Timur - Jembatan Tiga / Pluit which was inaugurated by President Soeharto on April 13, 1987.
The handover of assets for the operation of GT Pisangan has been carried out by PT Kresna Kusuma Dyandra Marga (KKDM) as the manager of the Becakayu Toll Road to CMNP on February 22, 2021. (CMNP & BPJT / Dms Public Relations)