berita

Preview Field Cikampek Toll Road - palimanan by the Minister of Public Works and Public Housing

 Preview Field Cikampek Toll Road - palimanan by the Minister of Public Works and Public Housing

Saturday, April 4, 2015, the Minister of Public Works and Public Housing (Minister PUPR) conduct a review of field development projects to Cikampek Toll Road - palimanan. The review was conducted to monitor the implementation of the construction currently underway. Director of PT. Lintas Marga Sedaya, Hudaya Arryanto said that the progress of construction has reached 92% of the total length of 116.75 km and will be implemented next week operational acceptance test along 20 km. Operational acceptance test will be done gradually by Eligible Team Operations, consisting of representatives from the Ministry of PUPR, Ministry of Transportation, and the Police.

Cikampek toll road - palimanan has 99 bridges and will use two types of pavement, namely rigid pavement (rigid pavement) along approximately 62 km, and the rest use flexible pavement (flexible pavement) depending on soil conditions, as submitted Hudaya Arryanto. In addition, the highway also has 6 pieces interchanges and overall require an investment of more than Rp. 12 trillion.

Cikampek Toll Roads - palimanan planned to be used on Eid 2015 season either with or without tariffs, taking into account the results of feasibility test functions and operations performed Tim. With the use of this highway for homecoming 2015, traffic density has been there in the northern Gaza believed to be reduced 40-60%. To ensure the readiness of this highway, the Minister PUPR scheduled to re-do the field survey in late May 2015.

Share Berita Ini

Berita Terkait