Relocation of the Main Cikarang Toll Gate to the Main Cikampek Toll Gate, Ready to use the smooth flow of Eid Al-Fitr 2019
Bekasi - To support the improvement of effective and efficient transaction system services for users of the Trans Java toll road that has been connected from Merak to East Probolinggo and support the smooth flow of Lebaran homecoming in 2019, the Ministry of Public Works and Public Housing (PUPR) is relocating the Toll Gate ( GT) Cikarang Utama which was originally located in KM 29 moved to KM 70 Jakarta - Cikampek Toll Road (GT Cikampek Utama).
This is done because the payment transaction system on the Jakarta - Cikampek Toll Road currently consists of two types of transactions, namely the open transaction system in the Jakarta - Cikarang Barat segment and transactions closed at the Cikarang Barat - Cikampek section carried out in GT Cikarang Utama can cause queues long at the toll gate. For users of cluster 1 Toll Road (Jakarta - Cikampek, Cikampek - Palimanan, Cikampek - Purwakarta - Padalarang, Padalarang - Cileunyi, Soreang - Pasir Koja) heading south (Bandung) and towards the East (Palimanan) also looking for queues when shipping at GT Cikarang Utama.
The relocation of GT Cikarang Utama to GT Cikampek Utama in KM 70 Jakarta - Cikampek Toll Road section will serve vehicle payments to Palimanan. Then, relocate the Cikarang Utama GT to GT Kalihurip Utama at KM 67 on the Cipularang Toll Road section which will serve payment transactions towards Cileunyi.
For the Jakarta - Cikampek toll payment transaction system, it will change the changes from the previous two types of open and closed transaction systems to the whole open transaction system. It is necessary to transfer the GT Cikampek Utama to the Cikampek Utama GT - GT Kalihurip Utama by calculating the number of each substation as many as 15 entry stations and 15 outgoing substations.
If needed, the relocation of the Cikarang Utama GT to the Cikampek Utama GT in KM 70 provides important benefits in supporting the smooth flow of vehicle traffic across the Jakarta - Cikampek Toll Road every contact. Relocation of the Cikampek Utama GT began to be operated when the homecoming flows to the backflow of Eid 2019 which coincides with the upcoming June 2019.
In avoiding the accumulation of vehicles when making payments on the 2019 Lebaran homecoming, GT Cikampek Utama will provide 21 entry stations or 21 outgoing substations (one way). Then in GT Kalihurip Utama will also provide 22 entry stations or 22 outgoing substations (one-way) and run the Mobile Reader.
Relocation of GT Cikarang Utama to Cikampek Utama GT synergizes with the construction of the Jakarta - Cikampek Tinggi toll road that is being built at this time in the future at GT Cikarang Utama to repair 6 payment substations used for toll road pillar construction. The displacement of GT Cikarang Utama is also related to the preparation of the elevated Jakarta - Cikampek toll road that uses one payment transaction. (ADCA)