Eligible Function Cikampek Toll Road - palimanan
Tuesday-Wednesday (14-15 / 4), begin field visits in order Eligible Function Test Evaluation Cikampek toll road - palimanan by a team consisting of representatives from the Ministry of PUPR, the Ministry of Transportation and Korlantas police. Acceptance test function was performed in two sections, namely section 3A Sta. 129 + 600-138 + 000 (SS. Subang / Cilemeri - Bantar Waru, along the 8.4 km) and Section 6B Sta. 201 + 000-208 + 000 (Ciwaringin / Babakan - palimanan, along 7 km).
In practice, the team is eligible to check the eligibility of the functions and operations functions Cikampek Toll Road - palimanan both in terms of technical, safety, and administration. Eligible functions of this highway will be done in several stages. The entire toll road is planned to be able to function before Lebaran this year.
Cikampek toll road-palimanan overall length 116.754 km and connects the Toll Road Jakarta - Cikampek and palimanan-kanci toll road, which is now in operation. This toll road is expected to be operated before Lebaran this year and is expected to reduce the traffic load on the northern coast.
Google