berita

BPJT Receives a Visit from Pemalang B Commission DPRD

BPJT Receives a Visit from Pemalang B Commission DPRD

Members of DPRD Pemalang Commission B make a visit to the office of the Toll Road Regulatory Agency (16/10). In order to find out the operating targets and the progress of the construction of the Pejagan - Pemalang and Pemalang - Batang Toll Roads. Located at the BPJT Meeting Room, the meeting was chaired by the BPJT Professional Elements Member Koentjahjo Pamboedi, attended by the Head of the General Section of the BPJT Secretariat, a representative from PT. Pemalang Batang Toll Road and a group of members of DPR Commission B.  "The operating target of Pejagan - Pemalang Toll Road Section III East Brebes - East Tegal and East Section IV Tegal - Pemalang will be operational in October 2018 while for Pemalang - Batang Toll Road is targeted to operate in October 2018." Said Mr. Koentjahjo. "For the construction progress of Pejagan - Pemalang Toll Road Section III East Brebes - East Tegal along 10.4 Km is 100% and Section IV East Tegal - Pemalang with a length of 26.9 Km by 100%. Besides that for Pemalang Toll Road - Batang Section I SS Pemalang - SS Pekalongan along 23.3 Km the construction progress is 89.28% and Section II SS Pekalongan - Batang with a length of 15.9 Km construction progress 91.78%. "He added

Share Berita Ini

Berita Terkait