Mission    III                            Planning and Implementation of
                                                    Multi-lane Free Flow (MLFF)
          Implementation   of   Modern   Toll              Implementation   of   cashless
          Road   System   through   Digital         1      transactions is the initial step
          Transformation                                   towards MLFF. Implementation of
                                                           cashless transactions at toll roads
          Strengthening     and     Improving              is a manifestation of modernization
          Performance of Independent Quality               of toll  payment  system to
          Control (IQC)                                    improve  speed  and  efficiency  of
                                                           transactions at toll road.
 BADAN   PENGATUR   JALAN   TOL  IQC consultants are representatives of   2  Cashless payment transaction


          ITRA  in  monitoring  toll  road  construction.
                                                           system is part of the National Non-
          So far, performance of IQC consultants
                                                           cash Movement supported by the
          has not been optimal due to a number
                                                           signing  under  a Joint Agreement
          of factors, such as involvement of IQC
                                                           between  Bank  Indonesia  and
          consultants starts once the construction
          project get underway and IQC consultants
                                                           Housing on May 31, 2017.
          are absent from the supervisory consultant       the Ministry of Public  Works and
          and construction executive contract. As a        ITRA  conducted    an  auction
          result, IQC only has limited accessibility.  3   prequalification  for  the  MLFF-
                                                           based    cashless   transaction
          To overcome such issue, IQC consultants          system in  July 2020. Using MLFF
          must be hired earlier so they can take part      technology, toll road users no
          in Pre Construction Meeting (PCM) before         longer need to stop at toll gates,
          field  construction  begins.  Moreover,  job     nor do they need to line up for
          description and responsibilities of IQC          paying.
          consultants will be mentioned throughout
          the document of contract between toll            ITRA has mapped some of
          road business entities and contractor as   4     the   problems,  for  example,
          well as supervisory consultant through           determination  of   commercial
          contract amendment.                              operation  scheme,  legal  aspect,
                                                           as  well as prevention and actions
          Using  Technology for Monitoring                 against violation, selection of front
          Quality of Construction Activities               end technology, detail road map
                                                           making, permit, toll road users
          A special system is needed to continuously       registration, and single identity
          monitor infrastructure conditions that           database.
          will serve as early detection of potential
          damage.

          1     Installation of tools to control
                overloaded  vehicles (Weight In
                Motion/WIM).

          2     ITRA, together with the Directorate
                of Bridges of the Directorate
                General of Highways and the Center
                for Research and Development of
  BADAN   PENGATUR   JALAN   TOL
                Road and Bridge of the Research
                and  Development  Agency,  has
                implemented     a    monitoring
                system. In addition, ITRA has also
                collaborated with higher education
                institutions and research institutes
                possessing readily implemented
                technology      (TRL/Technology
                Reading Level: 6-7).                                             Sistem transaksi pembayaran non tunai di Gerbang Tol Jombang-Bandar 2.


                                                       Transformasi Jalan Tol, Merajut Nusantara (Toll Road Transformation, Connecting The Nation)   |   115
   110   111   112   113   114   115   116   117   118   119   120