Page 127 - Buku BPJT 2020
P. 127

Improvement in Toll Road Investment
          Business Process

          1     This will  start with  preparing
                technical guidelines related to the
                institutional aspects of ITRA.

          2     Comprehensive analysis is carried
                out to select a list of toll road plans
                that are suitable with the strategic
                plan targets that  were prepared
 BADAN   PENGATUR   JALAN   TOL  3  Standardization of feasibility study.
                based on the preparedness criteria
                of each toll road.



                The feasibility study  will become
                the basis for toll road concessions,
                from economic feasibility analysis


                The potential  investors  need to
          4     to financial feasibility.
                ensure the funding before starting
                to build the toll road.


          5     The financial close stage is one of
                the financing readiness indicators
                for toll road entrepreneurs.

          6     New regulations are necessary to
                provide limits and guidelines for
                proposing  changes  in  business
                plans for toll road concessions.


























  BADAN   PENGATUR   JALAN   TOL









               Interchange Ciltim di Ruas Jalan Tol Tangerang-
                                          Merak.


                                                       Transformasi Jalan Tol, Merajut Nusantara (Toll Road Transformation, Connecting The Nation)   |   127
   122   123   124   125   126   127   128   129   130   131   132