Page 91 - Buku Annual Report BPJT 2021
P. 91

Kamal-Teluk Naga-Rajeg


                                             The Kamal-Teluk Naga-Rajeg toll road project is
                                             initiated by PT Duta Graha Karya. This project has been
                                             offered to investors a number of times through a series
                                             of market soundings. This project was also listed in the
                 04                          2021 Private Public Partnership Book that was
                                             published by the National Development Planning
                                             Agency (Bappenas).
              Confirmation of Prequalification
              Results Date                   The Kamal-Teluk Naga-Rajeg toll road will be
              7 February 2022                constructed with a length of 38.6 km, connecting the
                                             Cikupa, Rajeg, Mauk areas in Tangerang Regency with
              Participants That Passed       the Kamal area in West Jakarta. This toll road will also be
              Prequalification:              connected with the Sedyatmo toll road or the Soekarno
              PT Duta Graha Karya            Hatta Airport area.




           Akses Patimban


                                             In line with the construction of Patimban Harbor in
                                             Subang Regency, West Java, the Ministry of Public
                                             Works and  Housing  has  opened  a tender for the
                                             concession of the Patimban Access Toll Road.
                 05                          This 37.05 km toll road project has been introduced to

                                             investors since 2018 through a series of market
              Confirmation of Prequalification   soundings. In the beginning, this project was initiated
              Results Date                   by business entities. However, this project's status
              26 August 2021                 was changed to initiated by the government (solicited)
                                             after receiving a foreign loan commitment from Japan.
              Participants That Passed
              Prequalification:              The Patimban Access toll road will be connecting the
              Consortium                     Cikopo-Palimanan toll road with the harbor area. In
              • PT Jasa Marga (Persero) Tbk.  addition to providing access to the Patimban Harbor,
              • PT Nusa Raya Cipta Tbk.      the  toll road  is  also  projected to  be  a catalyst  for
              • PT Subang Sejahtera          regional  development   in   the   Triangular
              • PT Wijaya Karya (Persero) Tbk.  Cirebon-Patimban-Kertajati (Rebana) area as a new
              • PT Adhi Karya (Persero) Tbk.  economic growth area in West Java.
              • PT Pembangunan Perumahan
              (Persero) Tbk.














  BADAN PENGATUR JALAN TOL










                                                                                           Pekerja konstruksi pembangunan Jalan Tol Serpong-Balaraja


                                                                                 Improving Governance in The Provision of Tollroad in Indonesia    |   91
   86   87   88   89   90   91   92   93   94   95   96