Page 89 - Buku Annual Report BPJT 2021
P. 89

Jakarta Outer Ring Road (JORR Elevated) Cikunir-Ulujami

                                             The Jakarta Outer Ring Road (JORR) Elevated
                                             Cikunir-Ulujami Toll Road Project is an unsolicited
                                             project or a business entity proposal. The consortium
                                             that submitted such proposal consisted of PT Marga
                                             Metro Nusantara, PT Adhi Karya (Persero) Tbk, and PT
                  01                         Acset Indonusa Tbk.

              Confirmation of Prequalification   The JORR Elevated Cikunir-Ulujami Project will be
              Results                        constructed on the existing JORR toll road. This toll road
              30 July 2021                   is planned to have a length of 21.5 km with a starting
                                             point at Jatiasih and ending at the Ulujami Intersection.
              Participants That Passed
              Prequalification:              The construction of this new toll road on the existing
              Consortium                     JORR is expected to anticipate the increase in traffic.
              • PT Marga Metro Nusantara     This additional road capacity is expected to
              • PT Adhi Karya (Persero) Tbk  accommodate the increase in vehicle traffic so that
              • PT Acset Indonusa Tbk.       the flow of traffic on the road remains smooth.


           Gedebage-Tasikmalaya-Cilacap


                                             The Gedebage-Tasikmalaya-Cilacap toll road project is
                                             one of the largest toll road projects in Indonesia. This is
                                             because the length of this toll road reaches 206.5 km
                                             with an investment value of Rp56.2 trillion.
                 02                            This  toll  road  section  will  be  constructed  across  two

              Confirmation of Tender Results:  provinces, with a length of 171.4 km in West Java and
                                             32.25 km in Central Java.
              13 December 2021
                                             The consortium that won the Getaci toll road
              Winner of Tender:              concession tender formed a toll road business entity
              Consortium                     named PT Jasamarga Gedebage Cilacap (PT JGC). This
              • PT Jasa Marga (Persero) Tbk.,  business entity obtained concession right for 40 years
              • PT Daya Mulia Turangga-PT    from the issuance of the Work Order (WO).
              Gama Group -PT Jasa Sarana,
              • PT Pembangunan Perumahan     The construction of this toll road is hoped to increase
              (Persero) Tbk.,                economy growth in the southern corridor of West Java   Pekerja konstruksi pembangunan Jalan Tol Serpong-
              • PT Waskita Karya (Persero) Tbk.,  and Central Java.                            Balaraja
              • PT Wijaya Karya (Persero) Tbk.


           Gilimanuk-Mengwi

                                             The  Gilimanuk-Mengwi  toll road project  is initiated by
                                             business entities. This project will be the second toll
                                             road in Bali after the Bali Mandara toll road.

                 03                          The 96.21 km Gilimanuk-Mengwi toll road will connect
                                             Gilimanuk Harbor with the Sarbagita metropolitan area
              Confirmation of Prequalification   (Denpasar–Badung–Gianyar–Tabanan).  The
                                             construction of the Gilimanuk - Mengwi toll is expected
              Results                        to reduce travel time from 3-4 hours to 1 hour.
  BADAN PENGATUR JALAN TOL
              24 May 2021
                                             The Gilimanuk - Mengwi toll road will be divided into
              Participants That Passed       three sections, namely the Gilimanuk-Pekutatan
              Prequalification:              section (54 km), the Pekutatan-Soka section (23.6
              Consortium                     km), and the Soka-Mengwi section (21.8 km).
              • PT Sumber Rhodium Perkasa
              • PT Cipta Sejahtera Nusantara
              • PT Bumi Sentosa Dwi Agung




                                                                                Improving Governance in The Provision of Tollroad in Indonesia    |   89
   84   85   86   87   88   89   90   91   92   93   94