Jakarta Outer Ring Road (JORR Elevated) Cikunir-Ulujami
The Jakarta Outer Ring Road (JORR) Elevated
Cikunir-Ulujami Toll Road Project is an unsolicited
project or a business entity proposal. The consortium
that submitted such proposal consisted of PT Marga
Metro Nusantara, PT Adhi Karya (Persero) Tbk, and PT
01 Acset Indonusa Tbk.
Confirmation of Prequalification The JORR Elevated Cikunir-Ulujami Project will be
Results constructed on the existing JORR toll road. This toll road
30 July 2021 is planned to have a length of 21.5 km with a starting
point at Jatiasih and ending at the Ulujami Intersection.
Participants That Passed
Prequalification: The construction of this new toll road on the existing
Consortium JORR is expected to anticipate the increase in traffic.
• PT Marga Metro Nusantara This additional road capacity is expected to
• PT Adhi Karya (Persero) Tbk accommodate the increase in vehicle traffic so that
• PT Acset Indonusa Tbk. the flow of traffic on the road remains smooth.
Gedebage-Tasikmalaya-Cilacap
The Gedebage-Tasikmalaya-Cilacap toll road project is
one of the largest toll road projects in Indonesia. This is
because the length of this toll road reaches 206.5 km
with an investment value of Rp56.2 trillion.
02 This toll road section will be constructed across two
Confirmation of Tender Results: provinces, with a length of 171.4 km in West Java and
32.25 km in Central Java.
13 December 2021
The consortium that won the Getaci toll road
Winner of Tender: concession tender formed a toll road business entity
Consortium named PT Jasamarga Gedebage Cilacap (PT JGC). This
• PT Jasa Marga (Persero) Tbk., business entity obtained concession right for 40 years
• PT Daya Mulia Turangga-PT from the issuance of the Work Order (WO).
Gama Group -PT Jasa Sarana,
• PT Pembangunan Perumahan The construction of this toll road is hoped to increase
(Persero) Tbk., economy growth in the southern corridor of West Java Pekerja konstruksi pembangunan Jalan Tol Serpong-
• PT Waskita Karya (Persero) Tbk., and Central Java. Balaraja
• PT Wijaya Karya (Persero) Tbk.
Gilimanuk-Mengwi
The Gilimanuk-Mengwi toll road project is initiated by
business entities. This project will be the second toll
road in Bali after the Bali Mandara toll road.
03 The 96.21 km Gilimanuk-Mengwi toll road will connect
Gilimanuk Harbor with the Sarbagita metropolitan area
Confirmation of Prequalification (Denpasar–Badung–Gianyar–Tabanan). The
construction of the Gilimanuk - Mengwi toll is expected
Results to reduce travel time from 3-4 hours to 1 hour.
BADAN PENGATUR JALAN TOL
24 May 2021
The Gilimanuk - Mengwi toll road will be divided into
Participants That Passed three sections, namely the Gilimanuk-Pekutatan
Prequalification: section (54 km), the Pekutatan-Soka section (23.6
Consortium km), and the Soka-Mengwi section (21.8 km).
• PT Sumber Rhodium Perkasa
• PT Cipta Sejahtera Nusantara
• PT Bumi Sentosa Dwi Agung
Improving Governance in The Provision of Tollroad in Indonesia | 89