Gerbang Tol Kertajati Utama Akses Tol BIJB Kertajati
The operation of the new toll road sections 1B, Bogor Ring Road Section 3A, Sigli-Banda
adds to the length of toll roads operating in Aceh Section 3, Balikpapan-Samarinda
Indonesia. From 1978-2021, the cumulative Sections 1 and 5, as well as Medan-Binjai
length of operating toll roads was 2,457 Section 1A.
km. The construction of these toll roads
is an embodiment of the commitment to These ten new toll roads are connected
implementing President Joko Widodo's Sepanjang 2021, terdapat 10 with economic nodes such as industrial
priority development agenda, known as ruas jalan tol yang beroperasi, areas and tourism areas. In addition, they
Nawa Cita. tersebar di Pulau Jawa, Pulau are also connected to transportation
nodes such as airports and ports.
The new toll roads that were completed and Sumatera dan Kalimantan.
operated throughout 2021 consist of new Connectivity with such economic and
roads and extended sections or segments. transportation centers directly lowers
New roads refer to the operation of new Throughout 2021, there were logistics costs, increases goods and
toll roads. Extended sections or segments 10 operating toll roads, spread people mobility, as well as stimulates
are the continuation of roads that have across Java, Sumatra, and business activities in areas crossed by toll
previously been partially operating. Kalimantan. roads.
New toll road sections operating in 2021 With its function of increasing connectivity,
are Serpong-Cinere Section 1, Cibitung- the presence of toll roads is expected to
BADAN PENGATUR JALAN TOL
Cilincing Section 1, 6 Sections of the lower logistics costs, which until 2021 are
Jakarta Inner City Toll Road Section A, Pulo still high and uncompetitive compared to
Gebang-Kepala Gading, Serang-Panimbang countries in Southeast Asia. In accordance
Section 1, and Cengkareng-Batu Ceper- with the 2020-2024 National Medium-
Kunciran. Term Development Plan, the government
aims for the national logistics cost in 2024
Meanwhile, extended sections or to be 20 percent of the Gross Domestic
segments operating in 2021 include Kayu Product (GDP) from a baseline of 23.19
Agung-Palembang-Betung Section 1 Stage percent in 2019.
Improving Governance in The Provision of Tollroad in Indonesia | 59